Don't let concrete give you the summertime blues

Decorative Concrete

Random map cracking forced Dawkins to scarify the surface of his project and apply a stampable overlay in order to match the results of his second pour to the results of the first pour.

Related Articles

Read More Decorative Concrete

Spotlight: Mixing

Spotlight: Attachments

So you want to be a distributor...

Bob Harris
By Bob Harris
Contributing Editor

Decorative concrete can be an unpredictable animal at times. We find our problem phone calls from contractors increase when the temperatures rise during the heat of the summer and fall in the winter months. The bottom line is, whether you are working with two-component resins, cement-based skim coats or ready-mixed concrete, these materials set much quicker in warmer temperatures and much slower in cooler temperatures.

Recently we poured a 5-yard panel of stamped concrete (which is not a lot for a supposed pro), not taking into account we were using a mix design that we typically use during the winter months or when temperatures are under 80 degrees. This mix has a higher cement content which gives the concrete a needed boost for quicker setting times in the cool season. On our pour we started placing the concrete with no apparent problems other than our sweat burning our eyes on this 97-degree day.

A couple applications of color hardener later and some very fast finishing, we found ourselves removing the last stamping mat from the slab just one hour and fifteen minutes from the time we started placing the concrete. Shame on me for not taking the extreme conditions into account and compensating for the heat! I'm happy to report our test panel came out great thanks to some lightning fast finishing. You can bet some modifications were made to our next mix in addition to step retarding with Fritz-Pak's Mini Delay Set, allowing us much more time in those extreme conditions.

It is scenarios like this where a professional needs to tap into all of his or her past experiences and training in order to overcome jobsite adversities. A contractor can invest in training along with countless hours of practice and just when you think you have mastered certain techniques, wham, something comes up on an actual project that knocks you down, making you feel worn out, dejected and questioning your ability as a craftsman. I can certainly sympathize with you - I've had a number of my own gut wrenching sleepless nights lying in the bed wondering, "What the hell just happened and how could this catastrophe have been prevented?!" The reality of this fickle industry boils down to this - sometimes disaster is unavoidable and your company has to either fix or re-do the work at your expense.

This was the case with Cody Dawkins of Create-A-Crete, an aggressive, young, up-and-coming contractor in the greater Atlanta area who believes in training and doing things the right way. Despite Dawkins' impressive portfolio of successful applications, he had one of these nightmare projects. After a sleepless night, he decided to call me for some advice.